He described the changes as small steps compared with the problems accumulated by Hungary’s railways over several decades, but said they reflected an intention to make the railway adapt to passengers rather than the other way around.
More trains in the early morning and evening
Early-morning travel options will expand on the suburban lines towards Szob and Esztergom. More trains will also run on the Győr and Cegléd main lines, particularly in the afternoon and evening.
Winter services around Lake Balaton will be increased. A new direct Railjet will connect Miskolc and Munich in both directions, travelling via Füzesabony, Hatvan, Budapest, Győr and Vienna.
Vitézy did not provide service frequencies or detailed departure times, so the precise daily pattern will become clear when the full timetable is published.
Longer journeys towards Pécs and Szeged
The new timetable also includes a less welcome change. Scheduled journey times between Budapest and Pécs, and between Budapest and Szeged, will increase by several minutes.
Vitézy attributed the change to long-term deterioration of the tracks and persistent speed restrictions. He wrote that delays had become part of daily operations on several lines and would therefore be incorporated into the timetable. In his account, trains will not run more slowly than they do in practice today; the published schedule will instead reflect actual journey times.
He also called the timetable a “snapshot” of the railway’s condition. In his political assessment, the existing standard of the network was not maintained in previous years, and the problems cannot be resolved overnight.
Vitézy wrote that work was under way on EU-funded major projects under the Baross Gábor Terv, while domestic funding was being used elsewhere to remove speed restrictions. According to his statement, MÁV’s own investment budget will rise from HUF 30 billion to HUF 80 billion next year, alongside preparations for several rolling-stock procurement tenders.
The 2026–2027 railway timetable will take effect on 13 December. The announced service increases will affect passengers using the Szob, Esztergom, Győr and Cegléd routes, while journeys from Budapest to Pécs and Szeged will take several minutes longer on the published schedule.
Source: Vitézy Dávid




