2026 call for condominium renovation grants

2026 CONDOMINIUM RENOVATION

CALL FOR APPLICATIONS

The Finance and District Development Committee of the Council of the Erzsébetváros Local Government, District VII, Budapest announces a call for condominiums, housing cooperative buildings and predominantly residential properties in the administrative area of Erzsébetváros, to support their renovation work on the basis of Local Government Decree 7/2016 (II.18.) on renovation support for condominiums (hereinafter: Decree).

I.

Available funds

In accordance with Local Government Decree 43/2025 (XII.15.) on the budget of the Erzsébetváros Local Government, District VII, Budapest.

II.

Amount and method of support 

1.)    Applicants may only be, within the Local Government’s administrative area, 

–          condominiums

–          housing cooperative buildings

–          predominantly residential properties

(hereinafter: condominium).

2.)    For condominium renovation work , the order of priority taken into account when awarding support is as follows; the District Development and Chief Architect’s Department (hereinafter: Department), which carries out the assessment, may deviate from it based on the findings of the on-site inspection and/or the documents submitted:

I.                    Gas cut-off application

I. 

Applications may be submitted to support renovation of gas mains and risers if the gas supplier – the gas supplier at the time – has cut off the condominium from gas supply through no fault or will of its own, as reliably proven – due to a failed pressure tightness test, i.e. for technical reasons (hereinafter: Gas cut-off application)

Maximum amount for the renovation, of which 50% is an interest-free 

loan and 50% is non-repayable support:

HUF 5,000,000

II.                 Application for renovation work preventing intended use

II. 

Repair works affecting the common property of condominiums, on load-bearing structures and building services systems, that prevent or endanger their intended use and continuous operation, and that eliminate a life-threatening technical condition (hereinafter: repair works preventing intended use); the life- and accident-threatening condition must be proven.

Maximum amount for the renovation, of which 50% is a repayable interest-free loan and 50% is

non-repayable support:

a)

An official order issued by an authority not more than 60 days earlier, or an obligation contained in another official decision (e.g. balcony, facade element endangering public space, open gallery, floor slab, roof truss, roof structure, staircase flight, utilities, elevator, etc.)

HUF 7,000,000

b)

An expert opinion on utilities, not more than 60 days old, issued by an expert registered (recommended) by the utility provider or holding a license registered by the professional chambers, on the need for building services renovation (electrical network, water and sewage network)

HUF 6,000,000

c)

Renovation of chimneys and chimney sweep walkways, supported by an expert opinion not more than 120 days old issued by the body responsible for inspecting chimneys and chimney sweep walkways, concerning the chimneys and their accessories or prohibiting the use of the chimney (the part of the chimney above the top floor slab, except chimney lining)

HUF 5,000,000

d)

Works supported by an expert opinion not more than 60 days old prepared by an expert registered by the professional chambers (structural, timber protection opinions, utility network, elevator   etc.)

HUF 7,000,000

For applications for renovation work preventing intended use – except for official orders or obligations contained in other official decisions – an expert opinion not more than 60 days old at the time of application (120 days in the case of point c) of Table II, Chapter II), prepared by an expert registered by the professional chambers and clearly proving the life- and accident-threatening condition, must be attached. The expert opinion must state the nature, location and extent of the specific damage to the load-bearing structure.

For works preventing intended use, support can be requested for repair works that eliminate a life-threatening technical condition endangering the operation of load-bearing structures, as well as for repairs to eliminate life- and accident-threatening conditions needed for the normal operation of building services systems cut off by the utility provider.

Modernization work concerning compliance of the building structure with currently applicable standards/legislation cannot be considered work preventing intended use.

III.              Facade renovation works

[1]

III.

Renovation and repainting of facades of condominiums in undivided common ownership bordering public space – or, where there is a front garden, facing public space – (hereinafter: facade renovation works)

For freestanding buildings, renovation and repainting of all facades in undivided common ownership (hereinafter: facade renovation works)

Maximum amount for the renovation, of which 50% is a repayable interest-free loan and 50% is

non-repayable support:

Renovation aimed at eliminating the deteriorated technical condition of a facade bordering public space or at repainting it (including an anti-graffiti coating up to 3 meters high on the ground-floor facade bordering public space, but not including renovation/replacement of individually owned windows and doors)

HUF 25,000,000

For facade renovations affecting public space, an anti-graffiti coating up to 3 meters high on the ground-floor facade is mandatory; furthermore, the original ornamentation of the existing building may not be removed, and restoring the original condition is mandatory where data on it are available.

When renovating building facades, unauthorized, irregular and/or outdated advertising fixtures (display cases, display cabinets, advertising devices, air-conditioning boxes and other fixtures) must be removed from the facade.

After the facade renovation, only advertisements, shop signs and company lettering (and other fixtures) with an official permit/approval may be put back.

Partial renovation and repainting of facades of an existing building visible from public space is prohibited; renovation must cover the full width of the plot and, for corner buildings, all facades bordering public space.

[2] IV. Application for elevator renovation work

IV.

Eligible work – not proven by supporting documents – other than that listed in Table II

Maximum amount for the renovation, of which 50% is a repayable interest-free loan and 50% is non-repayable support:

general renovation of common elevators/lifts 

HUF 3,000,000

The application types in Tables I-IV above  are not interchangeable; a condominium application may only be submitted for the application types specified in the general meeting resolution.

3.)    Applications may only be submitted for technically separable works not yet started, except for works to renovate gas mains and risers where the gas supplier at the time has cut off the condominium from gas supply, as reliably proven, due to a failed pressure tightness test, i.e. for technical reasons.

4.)    Under the Decree, a condominium may apply for a maximum of 1 renovation  work per calendar year.

5.)    Gas cut-off applications may be submitted within 60 days of being cut off from gas supply; applications for works preventing intended use and for facade renovation may be submitted within 60 days of the condominium general meeting.

6.)    Applying under this call does not preclude taking part in other condominium calls announced by the Local Government or the Budapest Municipality.

7.)    Please note the following:

Altering or renovating a building’s street facade (in particular retrofitting insulation, repainting or changing the surface finish) is construction work subject to townscape notification and, for listed buildings, to heritage notification.

By submitting an application, the Condominium acknowledges the warnings in this point and that any application not complying with them is automatically invalid. The application is considered submitted once registered by the Local Government; if it is withdrawn, no new application can be submitted.

8.)    Amount of support per condominium in the given year: 

[3]

Up to the following share of the renovation budget adopted by the condominium:

For repair works preventing intended use and gas cut-off applications 

70%-a

but not more than the maximum

amounts set out in Tables I and II of point 2.) of this chapter, the amount rounded down  

to the nearest thousand forints

For general facade renovation works

70%-a

but not more than the maximum amounts set out in Table III of point 2.) of this chapter

the amount rounded down

to the nearest thousand forints

For general renovation of common elevators/lifts 

50%-a

but not more than the maximum amounts set out in Table IV of point 2.) of this chapter the amount rounded – down –

to the nearest thousand forints

For applications, the interest-free loan may be 50% of the support amount and the non-repayable support 50%. Deviation is only possible according to the rounding rules described above.

III.

Submission and assessment of applications

1.)           The call and its annexes can be downloaded from the Local Government’s website (www.erzsebetvaros.hu).

2.)           How to submit applications: the application documents, including all their contents, may only be submitted in PDF format electronically via Cégkapu/Ügyfélkapu only. The application documents must be compiled into 1, or at most 2, PDF files. Hivatali kapu address: short name: BPVIIPH; KRID code:500127390.

If the application documents exceed 2 PDF files, the application will be unsuccessful.

3.)           [4] Application period: from 00:00 on March 16, 2026 to midnight on September 13, 2026; for elevator renovation works, from 00:00 on June 22, 2026 to midnight on September 13, 2026.

4.)           Application period for gas cut-off applications: from 00:00 on March 16, 2026 until the budget funds indicated in Chapter I are used up, but no later than midnight on December 31, 2026.

5.)           Deadline for assessment: where funds are available in the budget, within 120 calendar days of submission, the Department submits the applications for decision to the next meeting of the Finance and District Development Committee of the Council (hereinafter: Committee); delays caused by the applicant are not included in this period. If additional funds are provided, the deadline is 120 days from when the funds become available.

6.)           The funds available for applications in the given year are set in the budget for that year adopted by the Council. Once the funds are exhausted, applications not yet assessed by the Committee are rejected for lack of funds.

7.)           The results of the call – uniformly, after all applications have been assessed – are published on the official website of the Erzsébetváros Local Government, District VII, Budapest. Participating applicants are notified of the result via Ügyfélkapu. 

IV. General conditions of participation

1.)       Condominiums can register their intention to take part by completing the “Application form” (Annex 1 of this call), attaching the annexes listed in Chapter V,

point 2.), and submitting them at the place, in the manner and within the deadline indicated in Chapter III, points 2.) – 3.).

2.)       Collecting and submitting the application documents is free of charge.

3.)       The support awarded may only be used to finance the renovation work approved by the Committee. Exceptions: 

a)    if a life- or accident-threatening situation has arisen in the condominium, or, as a result of a natural disaster, structural damage has occurred to the building, which the condominium must prove, in the case of a life- or accident-threatening situation (hereinafter: force majeure), with an expert opinion by an expert listed in the Register of Building Technical Experts (the budget for the modified work must also be attached), and, for structural damage caused by a natural disaster, photo documentation must be submitted. 

b)   if the gas supplier at the time has cut off the condominium from gas supply through no fault or will of its own, as reliably proven – due to a failed pressure tightness test, i.e. for technical reasons.The request for modified work must be accompanied by a reliable certificate from the gas supplier at the time, not more than 60 days old, on cutting off the condominium from gas supply, and the budget for the gas renovation. 

The Committee decides on the requested modification. Support for the modified work may not exceed the amount won in the call. The Committee does not take into account later references to expert opinions not submitted.

4.)       The interest-free loan is repaid over the period undertaken by the condominium, but within the following maximum term:

amount of repayable interest-free support (HUF)

Term  (months)

from HUF 0

to HUF 2,000,000

12

from HUF 2,000,001

to HUF 4,000,000

24

from HUF 4,000,001

to HUF 6,500,000

36

from HUF 6,500,001

to HUF 9,500,000

48

from HUF 9,500,001

to HUF 12,500,000

60

5.)       The following may not take part : a condominium that is more than two months in arrears in repaying previous grant support.

6.)       By submitting an application, the condominium also consents to the data recorded on the application  form in Annex 1 being processed in connection with the application, the procedure and the support decision by the Erzsébetváros Local Government, District VII, Budapest as issuer of the call and by the bodies preparing and making the support decision, in compliance with Regulation (EU) 2016/679 of the European Parliament and of the Council (GDPR) and Act

CXII of 2011 on the right to informational self-determination and freedom of information (hereinafter: Info Act). 

The applicant is responsible for ensuring that the data of natural persons in the materials it submits during the procedure have been processed lawfully and that the data subjects have received the necessary information.

7.)       The condominium acknowledges that, under Annex 1 of the Info Act, applicants’ data and the results of the call are published on the Local Government’s official website (www.erzsebetvaros.hu) .

8.)       The condominium acknowledges the provision of the Info Act under which any natural person, legal person or organization without legal personality that enters into a financial or business relationship with a person belonging to a subsystem of public finances must, on request, provide anyone with information on public interest data related to that relationship. 

9.)       Please note, common representatives, that administration via Cégkapu or Ügyfélkapu is mandatory! (The exception is submitting the notice granting the local government an immediate collection authorization (authorization letter).)

10.)   For matters not regulated in this call, the relevant provisions of Act CXCV of 2011 on public finances,  Act V of 2013 on the Civil Code and other related legislation apply.

11.)   A condominium receiving support for facade renovation or repainting undertakes to display the banner provided by EVIN Nonprofit Zrt. clearly on the scaffolding/facade for the entire duration of the works, from the start of work.

The banner can be requested from EVIN Nonprofit Zrt. at: 1071 Budapest, Damjanich utca 12., phone: +36 1 352-8655; email: evin@evin.hu. After the supported work is completed and before the accounts are submitted, the banner must be returned to EVIN Nonprofit Zrt.

12.)   A condominium receiving support undertakes to display the information board in Annex 5 of the call for 2 years from signing the support contract, taking architectural values into account. The winning condominium must have the board made in A4 size at its own expense. Of the data on the board in Annex 5, the type of work won (Project objective) and the amount of support may be changed, and must be filled in by the condominium according to the winning application before the board is made.

V.

Formal and content requirements for valid application documents,

and the order in which they are compiled

1.)    Formal and content requirements for submitting the application: 

a)       the application materials must be submitted electronically via Cégkapu/Ügyfélkapu.

Hivatali kapu address: short name: BPVIIPH; KRID code:500127390. 

b)      the subject of the submission via Cégkapu/Ügyfélkapu is:  “2026. évi társasház felújítási pályázat” (2026 condominium renovation application).

2.)    The documents to be submitted and the order in which they are compiled are as follows:

a)       Application form: Annex 1 of this call, completed fully, accurately and legibly (the name of the work applied for in Annex 1 must match the name of the work adopted in the condominium general meeting resolution, which is the basis for the name of the work in the support contract).

b)      complying with the conditions of the call and Act CXXXIII of 2003 on condominiums (hereinafter: Condominium Act) (at least a copy certified on every page by the common representative):

ba) for a general meeting

–  minutes of the condominium general meeting called and held after this call was announced, 

–  attendance sheet annexed to the minutes, showing legibly the names of all current owners, for companies or minors the names of those authorized to sign, and for absent co-owners the names of their proxies, each with separate signatures

–  copies of owners’ powers of attorney in the content and form required by Chapter VI, point 20 of Act CXXX of 2016 on the Code of Civil Procedure (for the principal, the proxy and 2 witnesses: name written legibly in block letters, signature, ID card number or address). A template is in Annex 2 of this call; it must show the exact address of the property concerned (including floor/door).

–  signature specimen, if a company holds an ownership share

bb) for written voting, the vote and the resulting resolution must also include what is set out in point c), and the common representative certifies its authenticity with their signature (for written voting, the resolution adopted and the voting ratio are sufficient – each page certified by the common representative and at least one member of the audit committee)

c)       General meeting resolution, to be approved by the condominium at the general meeting or by written vote: Annex 2 of this call, completed as appropriate

d)      a budget/quote adopted by the condominium general meeting including the detailed types of work/unit prices/quantities for the work applied for, not more than 60 days old at the time of application, whose amount must match the amount stated on the “Application form”. The budget may only include items of the work applied for; it may not include fees/costs of obtaining expert documents, specialist certificates, certificates from utility providers, public space use, etc. (except fees for pressure tests required by utility providers, etc.). The only exception is work under Table I of Chapter II, point 2.), where HUF 50,000 per gas meter can be accounted for as the cost of removing and reinstalling gas meters.

For applications for facade renovation under Table III of Chapter II, a budget prepared in accordance with the above requirements and approved by EVIN Nonprofit Zrt. – (using construction budgeting software) – must be attached! Before submitting the application, the budget must be submitted electronically via e-Papír to EVIN Nonprofit Zrt. for approval (1071 Budapest, Damjanich utca 12., phone: +36 1 352-8655; email: evin@evin.hu). The budget approved by EVIN Nonprofit Zrt., as certified by it, must be attached to the application.

e)         [5] a certificate issued in 2026 – not more than 60 days old at the time of application – by the account-holding bank or another financial institution (e.g. Fundamenta – Lakáskassza Zrt., Lakástakarék Pénztár, etc.), or a certificate on an assessed and approved loan application (for a loan application, also the certificates to be attached under the contract), showing that the part of the adopted budget exceeding the maximum support described in Chapter II of the call  is available as own contribution in the condominium’s account. 

If the support requested does not reach the maximum described in Chapter II, point 2 of the call, at least 

•               30% of the adopted budget (for works preventing intended use and gas cut-off applications)

•               50% (for general condominium renovation works) as own contribution must be available in the condominium’s account,

An advance invoice for the work applied for, dated in the year of application or the previous year, may be accepted as proof of own contribution.

f)     an identifiable sketch showing the work (part) to be renovated with local government support and the work already done (e.g. for roof renovation, a roof sketch marking the roof section applied for and the sections already renovated; for partial renovation of open galleries, a sketch marking the part to be renovated, as for roofs). The floor plans annexed to the Deed of Foundation are accepted as sketches (except for facade renovation).

The dimensioned sketch must allow the work applied for to be checked (length, area, number, etc.),

g)      for works preventing intended use, the supporting documents listed in Table II, points a)-d) of Chapter II, point 2.) (e.g. expert opinion, expert statement, etc.), not more than 60 days old at the time of application (120 days for point c) of Table II), must be attached. Please note that for works preventing intended use, instead of official orders or certificates issued by utility providers or inspection bodies, only documentation prepared by specialist experts registered on the website of the Hungarian Chamber of Engineers (www.mmk.hu) is accepted.

h)    for gas cut-off applications, a copy of the reliable certificate from the gas supplier at the time, not more than 120 days old at the time of application, on cutting off the condominium from gas supply

i)     for facade renovation works, the final building permit for the facade renovation/the valid decision acknowledging the approved townscape notification, and for listed buildings the final heritage permit issued by the heritage authority/the valid decision on the facade renovation,

j)     for facade renovation, the official decision approving the placement of advertisements, shop signs and company lettering (other fixtures) to be put back after the renovation must also be attached,

k)    photo documentation taken in 2026 – before submitting the application – of the work applied for, not yet started (the work applied for and the work area must be identifiable from the photos),

l)     the notice made at the account-holding bank granting the local government an immediate collection authorization (authorization letter including the year of the call) original copy (Annex 3). The authorization letter must be submitted together with the application documents.

m)  [6]for renovation of common elevators/lifts, the inspection report issued by ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. must be attached to the application.

3.)    A condition for support is that the condominium adopts the resolution under Chapter V, paragraph 2.), point c) with a voting ratio of at least 40% of all ownership shares, in accordance with the Condominium Act.

4.)    Applications are only valid if the application form for the support requested is completed correctly and all required annexes, fully compliant with the call in form (submitted via Cégkapu or Ügyfélkapu) and content, are submitted on time, including responding to any request to supply missing items.

VI.

Assessment of applications

1.)       The assessment period begins on the first working day after submission. 

Applications submitted outside the deadlines given in Chapter III, point 3.) of this call are automatically invalid.

2.)       Missing items may be supplied within 8 working days of receiving the request,  via Cégkapu for companies and via Ügyfélkapu for private individuals, only in PDF format, compiled into 1, or at most 2, files. The authenticity of documents attached is the responsibility of the applicant. Please note that documentation attached in a format other than PDF, or in more than 2 attachments, makes the application unsuccessful.

3.)       The day of receipt of the request to supply missing items is the day the applicant downloads the document sent via Cégkapu or Ügyfélkapu. The system confirms the upload of electronically sent documents. If the applicant does not collect the electronically sent document, it is deemed delivered on the 5th working day after upload (presumption of delivery). 

4.)       Any disadvantages resulting from incorrect data are borne by the condominium and may make the application invalid. 

5.)       Failure to supply missing items, or supplying them after the deadline, makes the application invalid.

6.)       Missing items may be supplied once within the given deadline, which cannot be extended.

7.)    If the condominium adopts the resolution under Chapter V, paragraph 2.), point c) with a voting ratio of less than 40% of all ownership shares, no request to supply missing items is possible and the application is automatically invalid.

8.)       Applications are assessed by the Committee under its statutory authority.  

9.)       For successful applications involving work costing more than HUF 10 million, the Local Government will, on request, transfer 50% of the support it provides (advance) to the bank account given by the Condominium within 30 days of the support contract being signed. If the work is not completed by the deadline set in the support contract, the winning applicant must transfer the support amount (advance) previously provided to the Condominium back to the Local Government’s account specified in the contract immediately, and at the latest within 8 days after the deadline for completing the work set in the support contract.

The request must be submitted together with the application documents; an advance cannot be requested after the Committee has assessed the application.

VII.

Conclusion of the support contract, consequences of breach, accounting

1.) A condition for using the support is that a contract under Annex 6 of this call is concluded between the Local Government and the condominium, based on the Committee’s decision and the application materials submitted by the condominium. The work specified in the contract cannot be changed later, even on request; any deviation by the applicant constitutes a breach of contract (except for the cases under Chapter IV, point 3.), on which the Committee decides separately)

2.) If any of the condominium’s data in the contract under Annex 6 of the call (e.g. common representative, bank account number) change between submitting the application and signing the contract, the condominium must report the change immediately, and at the latest within 10 working days of the change, and support the report with documents. 

3.)    The condominium is liable for any damage or disadvantage resulting from failure to report changes in the data in the contract.

4.)    The Department sends the applicant electronic notification that the support contract is ready, to the email address given in the application or via Hivatali kapu; the applicant must sign the support contract within 22 working days of receiving it. If the applicant does not sign the support contract within 22 working days of the Department’s notification that it is ready, this counts as withdrawal. (The notification is deemed received on the day the applicant opens the web link. Opening the link creates an electronic acknowledgment of receipt proving that the document was received. If the delivery system confirms to the Local Government that the applicant did not collect the electronically sent document despite notification, the document is deemed delivered on the 5th working day after the time shown in the notification certificate (presumption of delivery)) .

5.)       Where the conditions under the Public Procurement Act in force at the time are met, the use of budget support must be subject to public procurement, and the provisions of the Public Procurement Act in force at the time must be applied. 

6.)       The common representative must notify the Department in writing via Cégkapu/Ügyfélkapu of any intention to withdraw from the call. In the case under Chapter IV, point 3.), the support already awarded may be used for the work specified there instead of the work applied for, provided the applicant has proven it, and the need for the works to resolve it, to the Department with appropriate documents.

7.)       For all renovation calls, the work must be completed within the deadline shown in the table below  from signing the contract. The accounts must be submitted within the deadline shown in the table. In case of unforeseeable circumstances, the condominium may request an extension before the accounting deadline expires – within the 60 days before the deadline – and the Committee decides on the request. The Committee may extend the deadline once, by up to the period shown in the table. Missing these deadlines constitutes a breach of contract.

[7]

Deadline for completing the work (from signing the support contract)

Accounting deadline (from signing the support contract)

Maximum       possible

extension 

For repair works preventing intended use

180 days

210 days

90 days

For gas cut-off applications

180 days

210 days

90 days

For facade renovation works

365 days

395 days

180 days

For general renovation of common elevators/lifts 

365 days

395 days

180 days

If work has not started due to the contractor’s fault, the condominium may once find a new contractor and have the work done by them with the same technical content. A change of contractor may not increase the contracted support amount or change the completion deadlines in the contract already signed. A request for an extension is independent of a request to amend the contract due to a change of contractor, and even with a change of contractor the extended deadline may not be exceeded.

8.)       Accounts must be submitted to the Department managing the call. After the professional certification under the contract, the Finance Department handles financial control, processing and payment.

9.)       Accounting in installments is not possible.

10.)   For the accounts, the common representative must submit the following documents: Submitted electronically via Cégkapu/Ügyfélkapu:

a) list of accounting documents (Annex 4)

b) the invoice(s), completed in accordance with the legislation in force, with their annexes (invoice breakdown) 

    The following must be written on the original invoices – and copied together with it: “2026. évi VII. kerületi társasházi pályázati forrásból támogatva” (Supported from the 2026 District VII condominium grant). For cash invoices, the invoice(s) must state “fizetve” (paid).

c)  the works contract between the condominium and the contractor

d) for support awarded on the basis of an official order/notice, the official decision certifying fulfillment of the obligation (if the official decision has not been issued by the accounting deadline, proof of completion of the renovation work subject to the official order, submitted to the authority, must be attached)

e)  a copy of the document, compliant with the legislation in force, proving completion of the renovation work under the works contract (copy of the technical handover-acceptance report – signed by all parties involved, at least the client and the contractor)

f)  declaration on debts owed to the Local Government (Annex 4)

g) photo documentation of the completed work (on which the work done is clearly identifiable – or marked),

h) declaration on displaying the banner specified in Chapter IV, point 11) of the call, with photo documentation of the displayed banner attached.

i)   declaration on displaying the information board specified in Chapter IV, point 12) of the call, with photo documentation of the displayed board attached.

 

Depending on the work applied for:

j)   for works preventing intended use and  gas cut-off works: documents issued by the body, office or expert that issued the supporting document, proving that the work has been done

k) for facade renovation of listed buildings, the heritage authority’s certificate on the work done

l)   for work subject to townscape notification, proof that the completion notice has been submitted.

m)    [8] for renovation of common elevators/lifts, the inspection report issued by ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. certifying completion of the work.

11.)   The support is paid on the basis of the documents listed in point 10 of this chapter. During accounting, only invoices for work approved by the Committee and completed can be accepted, submitted together. If the full amount of support awarded cannot be paid on the basis of the invoices submitted, a one-time opportunity to supply missing items – within 5 working days – is given following a request (in this case too, the presumption of delivery applies under Chapter VI, point 3) of the call). If missing items are not supplied properly, no further invoices can be submitted or accepted to supplement the accounts, and the support is paid on the basis of the invoices already accepted. 

12.)   If, at the time of accounting, the Condominium has tax or other debts to the local government, the debt is deducted from the support. 

13.)   [9] If the amount of the invoice(s) submitted is less than twice the support (for general common elevator/lift applications) or 142.86% of the support (for applications for works preventing intended use, gas cut-off and facade renovation), the support is reduced proportionally; the monthly installment does not change (except the last monthly installment), but the term is reduced proportionally. 

14.)   Missing the deadlines set in this call constitutes a breach of contract. 

15.)   Public holidays, non-working days and administrative closures are not included in the deadlines set in the call.

16.)   In accordance with the support contract with the condominium, the Local Government transfers the support within 60 days of the accounts reaching the Finance Department (retrospective financing).

17.)   Any extra costs beyond the support awarded under the renovation call and beyond the work and amount specified in the budget are borne by the condominium.

18.)   The condominium must repay the interest-free loan, from the first day of the second month after the support arrives in its account, in the term and installments set out in the support contract, by transfer to the local government’s payment account. The current installment is due by the 15th of each month during the term. 

19.)   The condominium may pay off its remaining repayment obligation in a single sum at any time before the end of the repayment period. 

20.)   If the condominium is late in paying, the Local Government

a)    if it holds an ownership share in the condominium, offsets the condominium’s current monthly arrears proportionally – in the month of default – by deducting the current monthly common charge payable to the condominium; 

b)   charges default interest from the first day of the month following default, as set out in Act V of 2013 on the Civil Code; 

c)    after two monthly installments are in arrears, terminates the support contract with the condominium with immediate effect and at the same time takes action to recover the debt (support) and collect the default interest.

21.)   The Finance Department informs the condominium of financial settlement. Payments exceeding the support count as overpayment; any overpayment is refunded to the condominium’s bank account given in the contract. 

22.)   The Mayor’s Office may check the progress and completion of the condominium’s renovation work at any time. 

23.)   The Local Government reserves the right for the competent Departments of the Mayor’s Office and the Committee to inspect the documentation of all renovation work supported under the support contract.

24.)   In case of a serious breach of the support contract with the condominium (failure to meet deadlines, carrying out work different from the contract), the Local Government is entitled to terminate the support contract with immediate effect. The termination of contracts is prepared by the Department. 

Annexes to the call:

•       [10] Annex 1:        Application form

•       [11] Annex 2:        General meeting resolution template + Power of attorney for the general meeting template

•       [12] Annex 3:        Letter granting immediate collection authorization 

•       [13] Annex 4:        List of accounting documents + Declaration on debts owed to the local government

•       [14] Annex 5:        Template board for renovation support

•       [15] Annex 6:        Draft support contract

Budapest, June 2026

Péter Niedermüller

Mayor


[1] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[2] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[3] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[4] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[5] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[6] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[7] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[8] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[9] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[10] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[11] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[12] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[13] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[14] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026

[15] Amended by PKB resolution 352/2026 (VI.15.). Effective from June 16, 2026